CONSTRUCTION SUPPORT PROGRAM

SAFETY PROGRAM

Basically, the SEC CO. Safety program and procedure are applied.A senior Safety Officer with a construction background is normally in charge of the program, and one or two juniors as required assist in the supervision and implementation of SEC CO. Safety Standards.,for work in hazardous areas safety officer is assigned during all working hours.

 

FIELD ENGINEERING SUPERVISION

The field engineer directs this activity and is responsible for the following-:
Supervised the collection, checking, and transmittal of as-built survey Data, test result, and their information to the project office for incorporation in the project’s as-built documents. Receipt recording filling and distribution of original project drawings Specifications and revision thereto. Assist in the collection, preparation, and recording of daily, weekly, and Statistics for field Management review and approval prior to distribution to SEC CO. Project Offices.

 

QUALITY CONTROL

The primary function of Q.C. is the implementation of the Company Quality Manual and Procedures. Procedure and Preparation of required documents for Project record. In addition, the following are performed by Q.C Supervisors Periodic, preventative maintenance, an inspection of materials equipment in storage, and performance of required testing and record keeping.
Supervise, take of concrete samples arrange for proper storage, collect, Testing, and witness and record test results, and keep records of all pipeline welds and radiography test results.

Progressive Preparation of Mechanical completion and acceptance Documentation including the preparation of detailed “exception Items” listing work yet to be completed, during final stage of construction work